Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | SHIYI |
Model Number : | S-13-09 |
Price : | negotiable |
Supply Ability : | 10 Piece/Pieces per Month 20FT/GP/HC Luxury Mobile Expandable Assemble Shipping Container |
Delivery Time : | 8-10 work days |
Small containers are mainly 10 foot containers that can be used for storage and transportation, or as small mobile stores. Not only the color of the shell is your choice, but also a special curtain can be added. Only you can't think of it. Come to us with your good ideas.
Can be use as dormitory,camp,toilet,bathroom,shower room, changing room,school,shop,booth, kiosk,meeting room, guard house,etc.
10FT | Dimensions | MM | + / - |
Externel | Length | 2991 | + 0 - 5 |
Width | 2438 | - 5 | |
Height | 2591 | - 5 | |
Internal | Lenght | 2831 | + 0 - 5 |
Width | 2352 | - 5 | |
Height | 2385 | - 5 | |
Door Opening | Width | 2340 | - 5 |
Height | 2280 | - 5 | |
Inside Cubic Capacity | CU.M | CU.FT | |
12.5 | 442 | ||
KG | LBS | ||
Maixmum Gross Weight | 10160 | 22400 | |
Tara Weight | 1350 | 2980 | |
Maixmum Payload | 8810 | 19420 | |
Allowable Stacking Weight | 50800 | 11200 |
1. Basic materials: new / old Marine Containers
2. Thermal insulation materials: rock wool, PS extruded board, color steel sandwich panel
3. Wall panel and top materials: UV board, aluminum plastic board, bamboo wood fiber board, metal carving board
4. Auxiliary materials: wood board, cement board, gypsum board, OSB board, calcium carbonate board, PVC floor, wood plastic panel, perforated mesh board
5. Electrical materials: cable, conduit, distribution box, switch, socket, aviation socket, downlight, circuit layout
6. Door and window materials: aluminum alloy window hollow toughened glass, aluminum alloy door laminated toughened glass
7. Customized materials: overall bathroom, external painting, bedroom, reception room
1. Factory prefabrication, no construction waste on site,
transported to the destination can be directly installed and used;
2. Energy saving and environmental protection, high recycling rate
of box materials;
3. Strong and durable, good comprehensive performance;
4. The production and construction period is short, fast and
convenient;
5. Easy to uesd and the same mobility as container;
6. It has a long service life and can be used for more than 20
years;
7. It has strong mobility, low foundation requirements, and can be
moved at any time according to needs;
8. It can be used alone or in combination. It can be customized
according to customers' needs and has diversified forms;
9. High economic benefits.
1. Q: Is Shanghai Shiyi a factory or a trading company?
A: Shanghai Shiyi is a container housing, which is located in
Baoshan District, Shanghai. Shanghai Shiyi devotes itself to
manufacture and renovate the container house since 2013. The
workshop of Shanghai Shiyi is accessible to everyone for visiting
purpose.
2. Q: How can I get a quotation of the project?
A: If you have your own drawing, we can offer you a quotation
according to your design. If you don’t have any draft, our
designers will assist you.
3. Q: Does the electric power system work in my country?
A: Our electric power systems are standardized in USA, AU and EU.
4. Q: How to install the containers?
A: We will sent you an installation instruction and video. If you
still need help, we can provide on-site service. However, any other
extra fees may applied.
5. Q: How do you guarantee the quality of the products?
A:We believe that good quality establishes sustainability. Each
product manufactured from our factory has gone through
comprehensive and sophisticated testing procedures to ensure 100%
qualified before delivering.
6. Q:How about your leading time for production?
A: A normal container house usually takes at least 35 days to be
manufactured. A luxury container house takes 10-15 days more than
the normal one.
7. Q: How about the shipping?
A: Transportation by sea is a defaulted method to delivery . The
forwarding agent can provide a detail of shipping expenses.
![]() |